The 417 m² athletics hall is equipped with modern equipment, functional and high-quality training equipment, including cardio, strength and rehabilitation equipment.
The athletics hall of the basketball hall opened after reconstruction in May 2019. After the reconstruction, the area of the athletics hall has been expanded from 389 m2 to 417 m2, the ventilation system has been improved, the flooring has been replaced, partitions have been rebuilt, painting and tiling work has been carried out, as well as lighting and doors have been replaced.
New exercise machines have been purchased in the athletics hall – 16 cardio, 5 strength and 4 medical group exercise machines, as well as a pull-up bar, a power station and training equipment – bars, mats, belts. 47 existing exercise machines have been improved and repaired.